Built for the handoffs we underestimate on every project.

What I Do

Most operational problems in biopharma facilities don't start the day they surface. They start earlier, in the asset data that never made it into the CMMS, the maintenance program that exists on paper but not in practice, the workflow nobody adopted because nobody designed it for the people using it.

That's the gap I work in, the space between a capital project ending and an operations team actually being ready to run what got built.

Placeholder

About Me

I've spent my career at the intersection of capital projects and operations. First as a contractor delivering commissioning and qualification work at Bristol Myers Squibb, Sanofi Genzyme, and Amgen. Then six years inside BMS as a Maintenance Engineer, Systems Lifecycle Engineer, and Business Operations Manager, building the same programs from the inside that I now advise on from the outside.

What that arc gave me is something most people on either side of a facility handoff don't have. I've been the contractor handing over to operations, the operations engineer inheriting what contractors deliver, and the internal leader trying to get both sides to work together. I know what each of those roles sees, what they miss, and where things fall apart between them.

The project team and the operations team don't always speak the same language. They don't share the same definition of done. That gap is where the most expensive problems form, not because anyone's doing something wrong, but because no one designed the handoff.

That's what I enjoy working on. Every client works directly with me.